Global transmission capacity was estimated to have reached 19,883,744MVA by the end of 2021 and is forecasted to grow to 27,052,399MVA by 2027. Turkey had 211,926MVA of capacity in 2021 and this is expected to rise to 303,212MVA by 2027. Listed below are the five largest transmission projects by capacity in Turkey, according to GlobalData’s power database. GlobalData uses proprietary data and analytics to provide a complete picture of the global transmission segment. Buy the latest transmission substation project profiles here.

Smarter leaders trust GlobalData

Data Insights Karasu Seri Kapasitor Merkezi Substation

Buy the

Data Insights

The gold standard of business intelligence.

Find out more

1. Karasu Seri Kapasitor Merkezi Substation

Karasu Seri Kapasitor Merkezi Substation is a 420kV substation located at Sakarya, Sakarya, Turkey. The substation is under construction and is expected to be commissioned in 2023. The Karasu Seri Kapasitor Merkezi Substation will be operated by Turkiye Elektrik Iletim AS.

The designed voltage level of the substation is 420kV and the operating voltage level is 420kV. The step in voltage of the project is 420kV.

Karasu Seri Kapasitor Merkezi Substation is owned by Turkiye Elektrik Iletim AS. Buy the profile here.

2. Kayseri Kapasitor Substation

Kayseri Kapasitor Substation is a 420kV substation located at Kayseri Kapasitor, Kayseri, Turkey. The substation is under construction and is expected to be commissioned in 2023. The Kayseri Kapasitor Substation will be operated by Turkiye Elektrik Iletim AS.

The designed voltage level of the substation is 420kV and the operating voltage level is 420kV. The step in voltage of the project is 420kV.

Kayseri Kapasitor Substation is owned by Turkiye Elektrik Iletim AS. Buy the profile here.

3. Gebze Substation

Gebze Substation is a 400/33kV substation located at Gebze, Kocaeli, Turkey. The substation is planned and is expected to be commissioned in 2023. The Gebze Substation will be operated by Turkiye Elektrik Iletim AS.

The designed voltage level of the substation is 400/33kV and the operating voltage level is 400/33kV. The step in voltage of the project is 400kV and the step out voltage is 33kV. Upon completion, the substation will be able to operate at 250MVA.

Gebze Substation is owned by Turkiye Elektrik Iletim AS. Buy the profile here.

4. Kangal Substation – Upgrade – 400/154/33 kV

Kangal Substation – Upgrade – 400/154/33 kV is a 400/154/33kV substation located at Kangal, Sivas, Turkey. The substation is under construction and is expected to be commissioned in 2023. The Kangal Substation – Upgrade – 400/154/33 kV will be operated by Turkiye Elektrik Iletim AS.

The designed voltage level of the substation is 400/154/33kV and the operating voltage level is 400/154/33kV. The step in voltage of the project is 400kV and the step out voltage is 33kV.

Kangal Substation – Upgrade – 400/154/33 kV is owned by Turkiye Elektrik Iletim AS. Buy the profile here.

5. Seydisehir Substation – Upgrade – 400 kV

Seydisehir Substation – Upgrade – 400 kV is a 400kV substation located at Seydisehir, Konya, Turkey. The substation is planned and is expected to be commissioned in 2023. The Seydisehir Substation – Upgrade – 400 kV will be operated by Turkiye Elektrik Iletim AS.

The designed voltage level of the substation is 400kV and the operating voltage level is 400kV. The step in voltage of the project is 400kV.

Seydisehir Substation – Upgrade – 400 kV is owned by Turkiye Elektrik Iletim AS. Buy the profile here.

For more details on the latest transmission substation projects, buy the project profiles here.