Mailaram Pumped Storage is a 600MW hydro power project. It is planned in Telangana, India. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the announced stage. It will be developed in a single phase. The project construction is likely to commence in 2023 and is expected to enter into commercial operation in 2033. Buy the profile here.
Description
The project is being developed and currently owned by Astha Green Energy Ventures India.
Mailaram Pumped Storage is a pumped storage project. The net head of the project will be 156m. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, is expected to be 2 in number. The penstock length will be 659.39m. The penstock diameter will be 7.5m. The project is expected to generate 3,666 MWh of electricity.
The hydro power project consists of 2 turbines, each with 150MW nameplate capacity.
The hydro power project consists of 1 turbine with 300MW nameplate capacity.
Development status
The project construction is expected to commence from 2023. Subsequent to that it will enter into commercial operation by 2033.
For more details on Mailaram Pumped Storage, buy the profile here.