Global transmission capacity was estimated to have reached 19,883,744MVA by the end of 2021 and is forecasted to grow to 27,052,399MVA by 2027. the Netherlands had 37,364MVA of capacity in 2021 and this is expected to rise to 45,070MVA by 2027. Listed below are the five largest transmission projects by capacity in the Netherlands, according to GlobalData’s power database. GlobalData uses proprietary data and analytics to provide a complete picture of the global transmission segment. Buy the latest transmission substation project profiles here.

1. Breukelen Substation

Breukelen Substation is a 380/150kV substation located at Breukelen, Utrecht, the Netherlands. The substation is planned and is expected to be commissioned in 2024. The Breukelen Substation will be operated by TenneT TSO B.V..

The designed voltage level of the substation is 380/150kV and the operating voltage level is 380/150kV. The step in voltage of the project is 380kV and the step out voltage is 150kV.

Breukelen Substation is owned by TenneT TSO B.V.. Buy the profile here.

2. Dodewaard Substation

Dodewaard Substation is a 380kV substation located at Dodewaard, Gelderland, the Netherlands. The substation is planned and is expected to be commissioned in 2024. The Dodewaard Substation will be operated by TenneT TSO B.V..

The designed voltage level of the substation is 380kV and the operating voltage level is 380kV. The step in voltage of the project is 380kV and the step out voltage is 150kV.

Dodewaard Substation is owned by TenneT TSO B.V.. Buy the profile here.

3. Doetinchem Substation

Doetinchem Substation is a 380/150kV substation located at Doetinchem, Gelderland, the Netherlands. The substation is planned and is expected to be commissioned in 2024. The Doetinchem Substation will be operated by TenneT TSO B.V..

The designed voltage level of the substation is 380/150kV and the operating voltage level is 380/150kV. The step in voltage of the project is 380kV and the step out voltage is 150kV.

Doetinchem Substation is owned by TenneT TSO B.V.. Buy the profile here.

4. Eemshaven Substation

Eemshaven Substation is a 380kV substation located at Eemshaven, Groningen, the Netherlands. The substation is under construction and is expected to be commissioned in 2023. The Eemshaven Substation will be operated by TenneT TSO B.V..

The designed voltage level of the substation is 380kV and the operating voltage level is 380kV. The step in voltage of the project is 380kV.

Eemshaven Substation is owned by TenneT TSO B.V.. Buy the profile here.

5. Vijfhuizen Substation

Vijfhuizen Substation is a 380/150/50kV substation located at Vijfhuizen, North Holland, the Netherlands. The substation is planned and is expected to be commissioned in 2024. The Vijfhuizen Substation will be operated by TenneT TSO B.V..

The designed voltage level of the substation is 380/150/50kV and the operating voltage level is 380/150/50kV. The step in voltage of the project is 380kV and the step out voltage is 50kV.

Vijfhuizen Substation is owned by TenneT TSO B.V.. Buy the profile here.

For more details on the latest transmission substation projects, buy the project profiles here.

Premium Insights

From

The gold standard of business intelligence.

Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.