Global transmission line length was estimated to have reached 5,465,957Ckm by the end of 2021 and is forecasted to grow to 6,485,343Ckm by 2027. Pakistan had 56,749Ckm of line length in 2021 and this is expected to rise to 63,930Ckm by 2027. Listed below are the five largest transmission projects by line length in Pakistan, according to GlobalData’s power database. GlobalData uses proprietary data and analytics to provide a complete picture of the global transmission line segment. Buy the latest transmission line project profiles here.
1. Dasu – Mansehra Line
The Dasu – Mansehra Line is a 765kV overhead line with a length of 157Ckm running from Dasu Hydropower Project, Kohistan to Mansehra Grid Station, Mansehra. The project is planned and is expected to be commissioned in 2025.
The Dasu – Mansehra Line is an overhead line that will be operated by National Transmission & Despatch. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
2. Dasu – Palas Line
The Dasu – Palas Line is a 765kV overheadDasu to Palas. The project is planned and is expected to be commissioned in 2023.
The Dasu – Palas Line is an overhead line that will be operated by National Transmission & Despatch. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
3. Dasu Transmission Line
The Dasu Transmission Line is a 765kV overhead line with a length of 250Ckm running from Dasu Hydropower Plant, Dasu to Islamabad. The project is planned and is expected to be commissioned in 2025.
The Dasu Transmission Line is an overhead line that will be operated by National Transmission & Despatch. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
4. Mansehra – Islamabad Line
The Mansehra – Islamabad Line is a 765kV overhead line with a length of 97.6Ckm running from Mansehra to Islamabad. The project is planned and is expected to be commissioned in 2024.
The Mansehra – Islamabad Line is an overhead line that will be operated by National Transmission & Despatch. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
5. Gadani – Lahore Line
The Gadani – Lahore Line is a 600kV overhead line with a length of 1000Ckm running from Gadani to Lahore. The project is planned and is expected to be commissioned in 2024.
The Gadani – Lahore Line is an overhead line that will be operated by National Transmission & Despatch. The line will carry direct current (DC) through double circuit cable. Buy the profile here.
For more details on the latest transmission line projects, buy the project profiles here.