Global transmission line length was estimated to have reached 5,465,957Ckm by the end of 2021 and is forecasted to grow to 6,485,343Ckm by 2027. Bulgaria had 15,808Ckm of line length in 2021 and this is expected to rise to 16,772Ckm by 2027. Listed below are the five largest transmission projects by line length in Bulgaria, according to GlobalData’s power database. GlobalData uses proprietary data and analytics to provide a complete picture of the global transmission line segment. Buy the latest transmission line project profiles here.
1. Maritsa East – Burgas Line
The Maritsa East – Burgas Line is a 400kV overhead line with a length of 133Ckm running from Maritsa East to Burgas. The project is under construction and is expected to be commissioned in 2023.
The Maritsa East – Burgas Line is an overhead line that will be operated by Electroenergien Sistemen Operator. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
2. Maritza East – Burgas Line
The Maritza East – Burgas Line is a 400kV overhead line with a length of 133Ckm running from Maritza East to Burgas. The project is under construction and is expected to be commissioned in 2023.
The Maritza East – Burgas Line is an overhead line that will be operated by Electroenergien Sistemen Operator. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
3. Maritza Iztok – Maritza East III Line
The Maritza Iztok – Maritza East III Line is a 400kV overheadMaritza Iztok to Maritza East III. The project is under construction and is expected to be commissioned in 2023.
The Maritza Iztok – Maritza East III Line is an overhead line that will be operated by Electroenergien Sistemen Operator. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
4. Plovdiv – Maritsa East Line
The Plovdiv – Maritsa East Line is a 400kV overhead line with a length of 100Ckm running from Plovdiv to Maritsa East. The project is planned and is expected to be commissioned in 2024.
The Plovdiv – Maritsa East Line is an overhead line that will be operated by Electroenergien Sistemen Operator. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
5. Vetren – Blagoevgrad Line
The Vetren – Blagoevgrad Line is a 400kV overhead line with a length of 100Ckm running from Vetren to Blagoevgrad. The project is proposed and is expected to be commissioned in 2028.
The Vetren – Blagoevgrad Line is an overhead line that will be operated by Electroenergien Sistemen Operator. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
For more details on the latest transmission line projects, buy the project profiles here.
Data Insights