Shinagawa Combined Cycle Power Plant is a 1,140MW gas fired power project. It is located in Tokyo, Japan. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in July 2001. Buy the profile here.
Description
The project is currently owned by JERA with a stake of 100%.
It is a Combined Cycle Gas Turbine (CCGT) power plant.
Development status
The project got commissioned in July 2001.
Contractors involved
Toshiba JSW Power Systems was selected to render engineering procurement construction services for the gas fired power project.
Shinagawa Combined Cycle Power Plant (Shinagawa Combined Cycle Power Plant Block I) is equipped with GE Power 9FA gas turbine. The phase consists of 1 gas turbine with 247MW nameplate capacity.
Shinagawa Combined Cycle Power Plant (Shinagawa Combined Cycle Power Plant Block I) is equipped with GE Power Single Casing Single Flow Type steam turbine. The phase consists of 1 steam turbine with 133MW nameplate capacity.
Shinagawa Combined Cycle Power Plant (Shinagawa Combined Cycle Power Plant Block II) is equipped with GE Power 9FA gas turbine. The phase consists of 1 gas turbine with 247MW nameplate capacity.
Shinagawa Combined Cycle Power Plant (Shinagawa Combined Cycle Power Plant Block II) is equipped with GE Power Single Casing Single Flow Type steam turbine. The phase consists of 1 steam turbine with 133MW nameplate capacity.
Shinagawa Combined Cycle Power Plant (Shinagawa Combined Cycle Power Plant Block III) is equipped with GE Power 9FA gas turbine. The phase consists of 1 gas turbine with 247MW nameplate capacity.
Shinagawa Combined Cycle Power Plant (Shinagawa Combined Cycle Power Plant Block III) is equipped with GE Power Single Casing Single Flow Type steam turbine. The phase consists of 1 steam turbine with 133MW nameplate capacity.
GE Power supplied electric generator for the Shinagawa Combined Cycle Power Plant (Shinagawa Combined Cycle Power Plant Block I).
GE Power supplied electric generator for the Shinagawa Combined Cycle Power Plant (Shinagawa Combined Cycle Power Plant Block II).
GE Power supplied electric generator for the Shinagawa Combined Cycle Power Plant (Shinagawa Combined Cycle Power Plant Block III).
Toshiba Energy Systems and Solutions supplied steam boiler for the Shinagawa Combined Cycle Power Plant (Shinagawa Combined Cycle Power Plant Block I).
Toshiba Energy Systems and Solutions supplied steam boiler for the Shinagawa Combined Cycle Power Plant (Shinagawa Combined Cycle Power Plant Block II).
Toshiba Energy Systems and Solutions supplied steam boiler for the Shinagawa Combined Cycle Power Plant (Shinagawa Combined Cycle Power Plant Block III).
For more details on Shinagawa Combined Cycle Power Plant, buy the profile here.