Oxbow Hydro Power Project is an 80MW hydro power project. It is planned on Malibamatso river/basin in Butha-Buthe, Lesotho. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the permitting stage. It will be developed in a single phase. Post completion of the construction, the project is expected to get commissioned in 2029. Buy the profile here.
Description
The project is being developed and currently owned by Lesotho Highlands Development Authority. The company has a stake of 100%.
The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, is expected to be 1 in number. The penstock diameter will be 1.75m.
The hydro power project consists of 4 turbines, each with 20MW nameplate capacity.
The project will have 4 electric generators installed at the project site. The generator capacity is likely to be 23.3 MVA.
Development status
Post completion of the construction, the project is expected to get commissioned in 2029.
For more details on Oxbow Hydro Power Project, buy the profile here.